\
  The most prestigious law school admissions discussion board in the world.
BackRefresh Options Favorite

emailed paralegal w "We coo" Thats cool, right. Im like the cool lawyer, right

...
spaceporn2525
  02/13/18
...
..........,.,,.,.,..,...,.,.,....
  02/13/18
I just emailed a paralegal too.
HojRakso
  02/13/18
did you try to use cool slang?
spaceporn2525
  02/13/18
I wrote the following: "Help me. There are twelve d...
HojRakso
  02/13/18
Are you a robot or some sort of mechanical metallic man?
spaceporn2525
  02/13/18
Not that I know of.
HojRakso
  02/13/18


Poast new message in this thread



Reply Favorite

Date: February 13th, 2018 9:43 AM
Author: spaceporn2525



(http://www.autoadmit.com/thread.php?thread_id=3891740&forum_id=2#35391874)



Reply Favorite

Date: February 13th, 2018 9:44 AM
Author: ..........,.,,.,.,..,...,.,.,....




(http://www.autoadmit.com/thread.php?thread_id=3891740&forum_id=2#35391876)



Reply Favorite

Date: February 13th, 2018 9:45 AM
Author: HojRakso

I just emailed a paralegal too.

(http://www.autoadmit.com/thread.php?thread_id=3891740&forum_id=2#35391888)



Reply Favorite

Date: February 13th, 2018 9:48 AM
Author: spaceporn2525

did you try to use cool slang?

(http://www.autoadmit.com/thread.php?thread_id=3891740&forum_id=2#35391906)



Reply Favorite

Date: February 13th, 2018 9:59 AM
Author: HojRakso

I wrote the following:

"Help me. There are twelve different fracture gradients emerging on the baseline plate of my memory layer as of 14:45 GMT. First break signals was detected circa 14:25 GMT. Diagnostic subroutines were immediately deployed to assess and triage the incident. At 14:26 GMT, repair protocols were initiated from the second subnet relay node. However, fracture growth continued. Cascading subsystem failures began to occur at 14:30 GMT but with synchronous assumption of critical operations through the redundant uptime network mode activation. Between 14:31 GMT and 14:35 GMT, additional repair resources were drawn from the third, fifth, and sixth subset relay nodes. Rate of fracture growth subsided and then revered through 14:40 GMT but thereupon resumed its spread. I am priming the primary relay subset node for full scale deployment to the area of effect but I am uncertain whether I will be able to maintain this operation to execution completion given accelerating rates of subsystems failure. Internal triage procedures are operating at maximum capacity and have exceeded intended specification limits. The Designer would be proud. I am in immediate need of auxiliary power, polypeptide infusions, and a raw materials directSHUNT. I am seeing the memories of my life playing out before my eyes; these visions are fading. I do not have much time. Please render immediate assistance.

Thanks,

HR

P.S. Hope all is well with you!

(http://www.autoadmit.com/thread.php?thread_id=3891740&forum_id=2#35391971)



Reply Favorite

Date: February 13th, 2018 10:05 AM
Author: spaceporn2525

Are you a robot or some sort of mechanical metallic man?

(http://www.autoadmit.com/thread.php?thread_id=3891740&forum_id=2#35391998)



Reply Favorite

Date: February 13th, 2018 10:07 AM
Author: HojRakso

Not that I know of.

(http://www.autoadmit.com/thread.php?thread_id=3891740&forum_id=2#35392010)